国产亚洲欧洲网友拍2023国产在线无码_毛片亚洲日韩国产一区_欧美高清在线一区三区专区视频_国产美女牲交视频黄页_成人xxx免费观看_日韩高清精品在线观看_一本一本欧美亚洲精品suv_2020中文字字幕在线不卡_一区二区三区国产综合在线_91丨九色丨熟女

Welcome to Zibo Lugong Granulating Equipment Technology Co., Ltd.!

Tel.:86 0533-6403711 中文

Environmental protection equipment of Zibo Lugong Granulating Equipment Technology Co., Ltd.

Date: 2018-09-28 15:04:31 Click:

A side ditch should be set around the project production plant to drain away the initial rainwater in time to reduce the impact on groundwater. In summary, after taking anti-seepage measures and protective measures, the enterprise strengthens the daily production management on the basis of project production will not have an impact on groundwater. The environmental risk assessment will analyze and predict the potential dangers and harmful factors existing in the project, the unexpected accidents that may occur during the project operation (generally excluding man-made damage and natural disasters), the leakage of harmful, flammable and explosive materials, the personal and environmental impact and damage degree caused by it, and propose reasonable and feasible prevention, emergency and mitigation measures. In order to make the construction project accident rate, loss and environmental impact reach an acceptable level. Evaluate the damage to people outside the plant, the deterioration of environmental quality and the impact on the system.

According to the Notice on Further Strengthening Environmental Impact Assessment Management to Prevent Environmental Risks (No. [2012]77), Notice on Effectively Strengthening Risk Prevention and Strict Environmental Impact Assessment Management (No. [2012]98), Shandong Provincial Department of Environmental Protection forwarded the Notice on Effectively Strengthening Risk Prevention and Strict Environmental Impact Assessment Management (No. Lu Huanhan [2012] No. 509), guided by the Technical Guidelines for Environmental Risk Assessment of Construction Projects (HJ/T169-2004), proposes risk mitigation measures and emergency plans through risk identification, risk analysis and consequence calculation of the project, and provides information and basis for environmental management. Achieve the purpose of reducing danger and harm.

Workshop photo

Each production and operation area of the plant is connected by the road in the plant, and the general layout of the plant is required by the production process, saving land and facilitating the input of materials and product output, so that resources can be configured. The functional division of the plant is more clear, the arrangement between the devices is more compact, and the functional division is more reasonable.

According to the environmental testing results of the project, after the project plant is so arranged, the noise and air pollutants generated by the project plant can be discharged within the factory boundary to meet the standards.

The general layout of the project has clear functional zoning, smooth technological flow, short logistics, and basically non-cross-interfering logistics. The project locates the production workshop in the middle of the factory, reducing the impact of pollutants discharged by the project on the external environment, and the general layout of the project is reasonable.

This project has little impact on groundwater. All building units can be treated with anti-seepage treatment, pipelines are sealed, regular maintenance is carried out, reinforced concrete structures are adopted in the solid waste temporary storage room and workshop floor, and epoxy resin anti-seepage layer is laid to minimize the project's possible impact on groundwater.

This EIA will divide the project area into general impermeable zone and impermeable zone to analyze groundwater environmental impact and propose groundwater prevention measures.

In the project, facilities and areas where sewage leakage may occur, such as the septic tank stacking site, are taken as anti-seepage areas, and other areas are taken as general anti-seepage areas. Project drainage has little impact on groundwater environment.

Activated carbon adsorption device exhaust cylinder

Other news